Saturday, March 23, 2019

FIRST DAY OF PRODUCTION!


  Hello everyone we started filming our film opening! Everything went according to plan. We recorded all the shots we needed it, the lighting and set design came out with the style that we wanted it, and the actor, Gabe, performed perfectly his role.





    We started filming around 4:30PM for our first scene. We thought that for these scenes the time of the production was not going to affect us because we were filming inside a garage. We finished filming at 8:00PM.



   As you can see in this image, we were able to get the low key lighting and darker setting that we were looking before.  This was accomplished by shutting off the lights form the garage, and having only one portable light on. I think with this lighting, we made the scene look more dramatic, an aspect that we were very looking forward in to.




   Overall, the first day of production went well. We did not ran in to any major issues. Just smaller ones that could solve on the spot, and also we got a grand amount of footage for that scene that way in post-production we have more options to choose from.

No comments:

Post a Comment